• Login
NORVANREPORTS.COM |  Business News, Insurance, Taxation, Oil & Gas, Maritime News, Ghana, Africa, World
  • Home
  • News
    • General
    • Political
  • Economy
  • Business
    • Agribusiness
    • Aviation
    • Banking & Finance
    • Energy
    • Insurance
    • Manufacturing
    • Markets
    • Maritime
    • Real Estate
    • Tourism
    • Transport
  • Technology
    • Telecom
    • Cyber-security
    • Cryptocurrency
    • Tech-guide
    • Social Media
  • Features
    • Interviews
    • Opinions
  • Reports
    • Banking/Finance
    • Insurance
    • Budgets
    • GDP
    • Inflation
    • Central Bank
    • Sec/Gse
  • Lifestyle
    • Sports
    • Entertainment
    • Travel
    • Environment
    • Weather
  • NRTV
    • Audio
    • Video
No Result
View All Result
No Result
View All Result
NORVANREPORTS.COM |  Business News, Insurance, Taxation, Oil & Gas, Maritime News, Ghana, Africa, World
No Result
View All Result
Home Business

Tema Port Capacity Surges, But Rail Collapse and Road Bottlenecks Threaten Ghana’s Trade Hub Ambition

2 months ago
in Business, Economy, Editor's pick, Features, General, highlights, Home, home-news, latest News, Maritime, News, Political
2 min read
0 0
0
74
VIEWS
Share on FacebookShare on TwitterShare on Linkedin
  • Tema Port Capacity Surges, But Rail Collapse and Road Bottlenecks Threaten Ghana’s Trade Hub Ambition

Ghana’s US$1.50 billion investment in expanding Tema Port has positioned the facility among West Africa’s most competitive maritime gateways, but weak road, rail and inland logistics connections threaten to limit the economic returns from that investment, according to the World Bank.

The Bank’s latest Ghana Economic Update identifies Tema Port as a striking example of a broader structural weakness in the country’s transport strategy: major investments are often planned and executed by individual transport modes rather than as parts of an integrated logistics system.

“Port capacity without inland connectivity produces a bottleneck, not a hub,” the World Bank said.

Tema’s Terminal 3 expansion increased container-handling capacity from about 800,000 twenty-foot equivalent units to roughly 3.70 million TEUs, dramatically strengthening the port’s ability to handle regional and international trade.

Ghana’s ports collectively process about 85.00% of the country’s international trade, while annual seaborne throughput has consistently exceeded 25 million metric tonnes.

But the growing sophistication of port infrastructure is increasingly colliding with weaknesses beyond the terminal gates.

Tema serves not only the domestic economy but also competes for transit cargo moving to Burkina Faso, Mali and other landlocked Sahelian markets. Transit volumes rose from about 116,000 metric tonnes in 2001 to more than 1.40 million tonnes by 2020, accounting for approximately 7.70% of Tema’s traffic.

RelatedPosts

Republic Bank Ghana Wins Climate-Finance Award for Clean-Water Projects

Gov’t Pays Over GH¢4.40 billion towards SSNIT and Second-Tier Pension Obligations

Mahama and UK Foreign Secretary Talks Seek to Turn Historic Ties into Economic Value

That regional business is commercially important because Ghana competes directly with corridors through Abidjan in Côte d’Ivoire and Lomé in Togo.

The competitiveness of Tema is therefore determined not only by cranes, berths and terminal systems, but by what happens to cargo once it leaves the port.

Moving a 40-foot container from Tema to Ouagadougou costs approximately US$2,500 to US$3,500 and can take between four and 14 days, depending on road conditions, border procedures and checkpoint delays.

That cost-and-time profile illustrates the challenge facing Ghana’s ambition to become the preferred logistics gateway for West Africa.

The 818-kilometre Tema-Paga corridor remains the principal land route toward Burkina Faso and Mali, yet poor road conditions increase vehicle operating costs and journey times.

Heavy freight vehicles also accelerate road deterioration, creating a self-reinforcing cycle in which poor roads increase logistics costs while overloaded cargo trucks further damage the same infrastructure.

Rail should provide an alternative for bulk and long-distance freight, but Ghana’s railway network has suffered decades of decline.

Operational track fell from approximately 947 kilometres in 1960 to just 160 kilometres by 2020, while the proportion of the population with access to rail collapsed from 29.60% to 0.60%.

Freight volumes have declined by about 81.00% compared with 1990 levels.

The consequence is that commodities such as manganese and other heavy minerals are increasingly transported by road, placing additional pressure on infrastructure that was not designed to carry sustained heavy haulage at such scale.

The World Bank argues that Ghana should respond with a freight-led revival of the railway sector.

The Western Corridor, which can carry manganese and bauxite toward Takoradi, and the Eastern Corridor, which can connect cocoa and agricultural production toward Tema, offer identifiable cargo flows that could form the commercial basis for viable railway concessions.

“Freight-first rail sequencing offers the strongest commercial basis for rebuilding Ghana’s rail network,” the Bank said.

The argument represents an important shift from railway planning driven mainly by passenger ambitions.

Passenger services are politically attractive but have historically struggled to cover operating costs. Bulk freight, by contrast, can generate more predictable volumes and revenues, providing a stronger commercial foundation from which passenger services could eventually expand.

The same coordination failures are visible in the underperformance of Boankra Inland Port and Mpakadan, where investments have not yet reached their full potential because connecting infrastructure and regulatory arrangements remain incomplete.

That experience raises a serious accountability question for future projects.

Infrastructure is expensive not only when it is badly built, but when it is built in isolation.

A port without efficient rail and road links, an inland terminal without sufficient freight connectivity, or a railway without guaranteed cargo flows can all become underutilised assets even if the individual project itself is technically sound.

The first phase is estimated at about US$600 million and is being positioned as a strategic project to support Ghana’s participation in the African Continental Free Trade Area.

But the World Bank warns that hinterland connectivity must be designed alongside the port from the beginning rather than treated as an add-on after major capital has already been committed.

“Hinterland connectivity must be designed in from the outset, not retrofitted after investment has been committed,” it said.

Digitalisation through ICUMS, the Single Window System and the Truck Appointment System has improved customs administration and terminal efficiency, with container turnaround at Terminal 3 reduced to about three days.

The next challenge is extending those digital gains to Takoradi, inland terminals and the wider freight network so that efficiency improvements do not stop at the port gate.

Becoming West Africa’s preferred trade gateway requires more than modern terminals. It requires a transport system in which ports, roads, railways, inland terminals and digital logistics platforms operate as a single network.

The country has already spent heavily on world-class maritime infrastructure. The accountability test now is whether policymakers can connect those assets well enough to generate the trade, transit revenue, productivity and private investment needed to justify the expenditure.

Tema’s cranes and terminals may already be globally competitive. The real economic return now depends on what connects to them.

Tags: BoankraBut Rail Collapse and Road Bottlenecks Threaten Ghana’s Trade Hub AmbitionGhana’s US$1.50bn Tema Port Investment Risks Underperforming Without Rail and Hinterland LinksKeta Port Faces Warning from Tema as Ghana Struggles to Connect Ports to Inland MarketsMpakadan and Tema Expose Ghana’s Fragmented Transport PlanningTema Port Capacity SurgesWeak Corridors: Ghana’s Tema Investment Faces Inland Connectivity TestWorld Bank warnsWorld-Class Port
No Result
View All Result

Who we are?

NORVANREPORTS.COM |  Business News, Insurance, Taxation, Oil & Gas, Maritime News, Ghana, Africa, World

NorvanReports is a unique data, business, and financial portal aimed at providing accurate, impartial reporting of business news on Ghana, Africa, and around the world from a truly independent reporting and analysis point of view.

[the_ad_group id=”1111″]

© 2020 Norvanreports – credible news platform.
L: Hse #4 3rd Okle Link, Baatsonaa – Accra-Ghana T:+233-(0)26 451 1013 E: news@norvanreports.com info@norvanreports.com
All rights reserved we display professionalism at all stages of publications

No Result
View All Result
  • Home
  • Business
    • Agribusiness
    • Aviation
    • Energy
    • Insurance
    • Manufacturing
    • Real Estate
    • Maritime
    • Tourism
    • Transport
    • Banking & Finance
    • Trade
    • Markets
  • Economy
  • Reports
  • Technology
    • Cryptocurrency
    • Cyber-security
    • Social Media
    • Tech-guide
    • Telecom
  • Features
    • Interviews
    • Opinions
  • Lifestyle
    • Entertainment
    • Sports
    • Travel
    • Environment
    • Weather
  • NRTV
    • Audio
    • Video

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
NORVANREPORTS.COM | Business News, Insurance, Taxation, Oil & Gas, Maritime News, Ghana, Africa, World
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.